| Recent letters of Recommendation |
| Thornwood Industrial Estate, Epping - New Car Parking Areas |
| 17 March 2005 |
|
Mrs Isabelle Alldis - Director of The Thornwood Farming and Storage Company wrote to us on the 7th March 2005 saying:-
"The Pryor team did an excellent job for us. I felt this project was a lot smaller than they usually do but they were very aware of the tight site constraints they had to work in and showed consideration to all users of the estate.
I found watching the dexterity of the excavator operator was amazing, and the large ADT operator did his very best with our old roads and members of the public visiting the estate.
Altogether a very satisfactory job - thank you." |
| Do you have a local requirement? Please contact us or send an email to contracts@pryor.co.uk and we will endeavour to provide the best assistance possible using our small works team. |
|
| Pandon Wood SSSI Pond - Reed Clearance |
| 24 February 2005 |
|
Darren Fazackerley, Landscape Officer with Harlow Council wrote to us on 23 February 2005 saying:-
"Thank you for the excellent work undertaken to clear the pond at Parndon Wood SSSI of reedmace and the lower pool. I am very pleased with the work undertaken particularly in an environmentally sensitive location and it is good to see the pond life recovering already.
Many thanks again." |
|
Willow Tree Farm Reservoir- Ten Mile Bank |
| 13 November 2004 |
|
John Kisby of E W Kisby & Son Ltd. wrote to us in November saying:-
"We employed C J Pryor (Contracts) Ltd. in 2003 to build a reservoir at Willow Tree Farm, Station Road, Ten Mile Bank, Norfolk. From start to finish we found them to be a very professional , well orgainised company to deal with.
Although working close to our own main yard at a time when the farm was at its very busiest, they carried out their work with a minimum of inconvenience to ourselves. However, when necessary they did consult with us, especially in regard to health and safety, and access. These matters were dealt with quickly before any problems arose.
Our lasting impression was a well run, efficient , friendly group of people to deal with, machine operators and managers included. " |
 |
|
Completed reservoir - Willow Tree Farm, Ten Mile Bank |
|
|
Maymeads Marsh - Harlow, Essex |
| 25 October 2004 |
|
Nature Reserve Warden Mr Colin Lincoln, of Parndon Wood Nature Reserve, Harlow wrote to us in October saying:-
"Just a few lines to say thank you for the excellent work carried out on our Maymeads Marsh Nature Reserve, the fast and efficient clearance of the sedge and rushes from the main body of water has kept the disturbance and stress to the resident wildlife down to a minimum.
The work has now given the public unobstructed views across the water, and the removal of debris and silt from the inlet stream will help keep the Reserve water levels to their optimum height, the surrounding area where the spoil has been spread will soon recover to give the inhabitants of the marsh back a first class environment in which to live.
Thanks again for all your help in this project." |
|

Completed:- Habitat no longer choked with reeds |
|
|
Genome Campus - Wetlands Hinxton Cambridgeshire - Update |
| 8 October 2004 |
|
“New Wetlands a haven for rare wildlife” |
|
The Pryor Group are delighted with recent reports in the Cambridge Weekly News concerning the above project. As the earthworks contractor we formed the wetland features as part of the enabling works. One year on the results can be seen by all. |
|

|
|
Martin Baker of the Cambridgeshire Wildlife Trust, said: “This project is really exciting. We’ve had a fantastic array of wetland birds there, including waders, lapwings and the rare little ringed plover.” Julian Dudley-Smith of MACE the construction management company said: “It’s been a wonderful transformation from a flat barren field to an idyllic spot which local people will be able to enjoy…”
We work with our client’s to produce the best features in the built environment. If you want to achieve the highest standards we invite you to partner with The Pryor Group please contact the team at contracts@pryor.co.uk for further information. |
| Extracts reproduced by permission thanks to the Editor of the Cambridge Weekly News - Saffron Walden Edition. |
|
| London Borough of Ealing, Greenford Cemetery, Ealing |
| 25 March 2004 |
|
On 16th March 2004 Nick Kalnakov of the London Borough of Ealing wrote to us stating -
"This is to confirm that we have used CJ Pryor in relation to ground works and site clearance for the extension of Greenford Cemetery, Ealing. The works took place at the end of 2003 - beginning of 2004.
The works required: ground excavation, removing chemically and mechanically contaminated material off site to licensed tips, organising a drainage construction to comply with specification and levelling the site. During the work process effective relationship was established and the works proceeded smoothly with any problems being solved quickly and efficiently.
In our work with CJ Pryor the main benefiting points were:-
- Well organised works site and program of work flexible enough to respond to any necessary changes.
- Good H & S procedures and enforcement.
- Good record keeping and financial management.
- Total transparency and accountability all through the project.
- Willingness to help with advice and appropriate proposals for the best way to overcome any site issues.
- Easy communication and responsiveness.
- Completing the works as required and well within budget.
Based on the project we have completed with CJ PRYOR [we] would not hesitate to use them again in the future."
|
| M11 Junction 4 Northbound Woodford Hybrid Contract |
| 03 February 2004 |
| RMC Surfacing Contracts Manager Mr Nick Ash wrote to us in November 2003 stating:-
"We would take this opportunity to thank you for your works on the above contract.
The works were carried out to a high standard by a professional and cooperative management team.
We look forward to working with you on future projects and wish you success in the future."
|
| Squerryes Sand Extraction Pit, Westerham Kent - Phase 3 Contract |
| 12 Novenber 2003 |
| URS Associate Director Mr Paul Gross wrote to us in September 2003 as follows:-
"Following the successful completion of sand extraction at Squerryes, Westerham I wish to express my thanks on behalf of URS Corporation Ltd to CJ Pryor (Contracts) Ltd for their efforts in this regard.
The cooperation and diligence of both your management and site staff was essential in achieving the excellent results obtained for our client, Redland Roofing Systems Ltd.
We look forward to working with you on other projects in the near future."
|
| RSPB Demolition in Rainham Marshes, Essex adjacent SSSI |
| 7 October 2003 |
| Bettridge Turner & Partners Director Mr Brian Gooch wrote to us in October 2003 saying:-
"Your price was competitive and I can confirm that both BTP and the RSPB would have no hesitation in including your company on future tender lists for work of this nature."
|
| Gilden Way Anti-climb Earth Bank, Harlow Essex |
| 7 October 2003 |
| Harlow Parks Operations Manager Mr Patrick Smith wrote to us in August 2003 stating:-
"I have just returned from holiday and notice that you have completed the earth bank on Gilden Way. I would like to thank you for a job well done; to specification, timely and professionally executed."
|
| Genome Campus Contract, Hinxton Cambridgeshire |
| 11 June 2003 |
|
John Doyle Construction Project Manager Mr Phil Webber wrote to us in May 2003 to say:-
"I would like to take this opportunity to thank you and your excellent team for the work that has been carried out at Hinxton to date."
|
|
| Tag McLaren Racing |
| October 2002 |
|
C.J.Pryor (Contracts) Ltd has successfully completed phases 1,2 & 3 earthworks for this highly prestigeous contract to construct a state of the art Formula 1 racing test and development centre near Woking in Surrey. Our early involvement as part of the construction team resulted in significant cost savings to the project. |
 |